Testing & Commissioning
Proving control systems behave exactly as intended — before they go live. Rigorous, documented FAT, SAT and commissioning that takes the risk out of start-up.
"Has this ever worked?"
- someone on a factory floor at 2amWe test methodically — factory acceptance, site acceptance and full commissioning — so problems surface in a controlled environment, not during a live start-up when the cost of failure is highest. Every test is planned against the control philosophy and recorded, giving you an auditable account of what was checked and how it behaved.
Because the same team often designs, programs and tests, there are no handover gaps: the people proving the system understand exactly how it was meant to work.
From test plan to clean handover
- Test plans & specsStructured plans tied back to the control philosophy.
- Factory acceptance (FAT)Proving the system before it leaves the workshop.
- Site acceptance (SAT)Verifying the installed system on site.
- I/O & loop checksEnd-to-end verification of every signal.
- Functional & sequence testingConfirming the system does what it should, safely, and repeatably.
- Commissioning & handoverSnagging, records and a clean handover pack.
No surprises on start-up day
Start-up is the moment everything is on the line. Thorough testing beforehand is how we make it uneventful — every I/O checked, every sequence proven, every deviation logged and closed out before the process runs for real.
The rest of the lifecycle
Need a system proven before it goes live?
Tell us what's being installed and when, and we'll put together the testing and commissioning to take the risk out of start-up.